Features New 2008 NEC® Section 250.94 Requirements
An intersystem bonding termination for connecting intersystem bonding and grounding connectors required for other systems shall be provided external to enclosures at the service equipment and at the disconnecting means for any additional buildings or structures.
The intersystem bonding termination device shall not interfere with opening a service or metering equipment enclosure.
The intersystem bonding termination shall have the capacity for connection of not less than three intersystem bonding conductors.
Ordering Information
EM MB5-3 Intersystem Bonding Terminal First Choice Meter Box Clamp
Meter box bonding and grounding connector.
Application Bonding and grounding telco and CATV to power ground.
Features
Meets new 2008 NEC® Section 250.94 Requirements.
Stainless steel and copper alloy to reduce corrosion.
Applies with a standard terminal wrench/nut runner—no special tools.
Gel-filled cap helps prevent corrosion at the piercing points.
Easy, foolproof installation.
Mounts on the side—does not interfere with the cover or collapse the sides.
Small and inconspicuous.
Accommodates #6–#14 AWG solid or stranded ground wire.
Makes electrical contact under the dripcap of the box, on bare, unpainted metal.
Electric Motion Company, Inc. Winchester Business Park • 110 Groppo Drive • P.O. Box 626 • Winsted CT 06098 • Tel 860/379-8515 • Fax 860/379-7835 • 8 am–5 pm ET, Monday–Friday